Non-Compliance detail


  
Summary
 
Licence number: 1802
Annual Return Start: 01 Jun 2013
Annual Return End: 31 May 2014
Date Received: 23 Jul 2014
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
P1.3 Flow meter at Point 10 failed. Several technologies trialled. Failure related to remoteness of installation. Alternative calculation method per M6.5 used. New device to be installed which should provide accurate flow measurement. EPA to monitor future compliance with this condition 1
L2 Nitrogen load limit exceeded due to reduced capacity of secondary treatment process during anaerobic and aeration upgrades. Upgrade will provide greater control of system and allow flow to be distributed more evenly. EPA to monitor future compliance with this condition 1